State energy reference · Data as of Nov. 18, 2026
Texas power and energy: data, grid reliability and data centers
Texas uses more electricity than any other state, and its demand is climbing fast: retail sales rose about 25% from 2020 to 2025, to 533 million megawatthours, according to the U.S. Energy Information Administration. The state's main grid operator, ERCOT, set an all-time peak of 91,155 megawatts on July 22, 2026 (ERCOT, unofficial until final settlement).
Data centers account for most of the new load seeking to connect: in June 2026 it was tracking more than 438,000 megawatts of large-load connection requests, nearly 89% of them from data centers (ERCOT). NERC rates ERCOT at normal risk for winter 2026–2027, an improvement from last winter, but its long-term assessment moves ERCOT to high risk by 2029 if load growth keeps outpacing new resources (NERC).
Key data
| Measure | Value | Notes | Source |
|---|---|---|---|
| Average retail price, all sectors (2025) | 9.97¢/kWh | U.S. average 13.56¢. Rank 42 of 50 states + D.C. (1 = highest price) | EIA Electric Power Annual, Table 2.10 |
| Residential price (2025) | 15.40¢/kWh | U.S. 17.23¢. Rank 25 of 51 | EIA Table 2.10 |
| Commercial price (2025) | 8.56¢/kWh | U.S. 13.37¢. Rank 49 of 51 | EIA Table 2.10 |
| Industrial price (2025) | 6.35¢/kWh | U.S. 8.51¢. Rank 48 of 51 | EIA Table 2.10 |
| Total retail sales (2025) | 533.3 million MWh | No. 1 among the states; up 5.5% from 2024 | EIA Table 2.8 |
| Change in retail sales, 2020–2025 | +24.9% | 426.9 million MWh in 2020 (EIA State Electricity Profile, Table 8) to 533.3 million MWh in 2025 (EIA Table 2.8) | EIA Texas Electricity Profile |
| Utility-scale net generation (2025) | 601.0 million MWh | No. 1 among the states; up 6.1% from 2024 | EIA Table 3.7 |
| ERCOT all-time peak demand | 91,155 MW (July 22, 2026) | Previous record 85,508 MW (Aug. 10, 2023). Unofficial until final settlement; page updated Nov. 6, 2026 | ERCOT peak demand records |
Generation mix, 2025
| Source | Share | Thousand MWh |
|---|---|---|
| Natural gas | 48.3% | 290,246 |
| Wind | 21.7% | 130,136 |
| Coal | 11.5% | 68,889 |
| Solar (utility-scale) | 11% | 66,058 |
| Nuclear | 7% | 41,841 |
| Other (hydro, biomass, petroleum, other gases, net storage) | 0.6% | 3,812 |
| Total | 600,982 |
Utility-scale facilities, all sectors, thousand megawatthours. Shares may not sum to 100% because of rounding. Small-scale (rooftop) solar, estimated at 5.4 million MWh in 2025, is not included.
Source: EIA Electric Power Annual 2025, Tables 3.7–3.22 (released Oct. 21, 2026)
Grid reliability
Most of Texas is served by the Electric Reliability Council of Texas (ERCOT), an independent system operator located entirely in the state that operates as a single balancing authority and serves more than 27 million customers. Parts of the state lie in other NERC assessment areas, including MRO-SPP and WECC-Southwest (NERC 2026–2027 Winter Reliability Assessment).
Winter 2026–2027: normal risk. NERC's assessment, released Nov. 18, 2026, lowered ERCOT's risk level from last winter, citing about 1.7 GW of new natural-gas generation, nearly 3.5 GW of new batteries and better cold-weather performance. ERCOT's anticipated reserve margin for the winter peak is 34.8%; its probabilistic study puts the chance of an energy emergency alert in the riskiest hour at 2.7% (NERC WRA; NERC news release).
Summer 2026: normal risk, with localized constraints in Far West Texas, where transmission limits can bind during high demand with low wind and no solar (NERC 2026 Summer Reliability Assessment).
Long term: elevated risk in 2026–2028, high risk in 2029–2030. NERC's 2025 Long-Term Reliability Assessment (January 2026) says near-term unserved-energy metrics improved, but rapid load growth outpaces projected resource additions in later years (NERC LTRA).
Demand outlook. ERCOT's preliminary 2026 long-term load forecast, filed April 15, 2026, projects about 367,790 MW of demand by 2032; ERCOT said it believes the forecast is higher than expected future load growth and proposed adjustments (ERCOT; ERCOT market notice).
Outage history. Texas utilities reporting to EIA averaged 1,614 minutes of interruption per customer in 2024 including major events (153 minutes excluding major event days) (EIA Texas Electricity Profile, Table 17).
Big projects and what to watch
Reference summary of public utility, grid-operator and company filings; not news coverage.
ERCOT "Batch Zero" large-load process
The Public Utility Commission of Texas approved ERCOT's batch study process for large users of 75 MW and more on June 18, 2026. ERCOT expects a final transmission plan for the batch in fall 2027, and applications for Batch 1 to open in summer 2027 (ERCOT).
Texas Energy Fund gas plants
As of Nov. 2, 2026, the state's In-ERCOT Generation Loan Program listed nine loans for new natural-gas plants totaling about 5,446 MW and $4.11 billion, including CPV Basin Ranch (1,350 MW) and Vistra's Permian Power I (860 MW) in the West load zone; about $2.08 billion had been disbursed (Texas Energy Fund).
Stargate AI data centers
OpenAI, Oracle and SoftBank described a flagship Stargate campus in Abilene as up and running in September 2025, with a potential 600 MW expansion nearby and new sites in Shackelford County and Milam County (OpenAI, Sept. 23, 2025).
What to watch
ERCOT's final 2026 long-term load forecast adjustments and the Batch Zero study results, and NERC's next Long-Term Reliability Assessment, which will update ERCOT's 2029–2030 risk rating.
On the Powering America Podcast
June 9, 2026
Why Texas is betting big on data centers, with Garrett Fulce
Garrett Fulce, Owner, Fulce Consulting
Texas's growing data-center industry and a regulatory approach that balances community concerns with technological advancement.
“Texas has figured out a way to give those people a voice in the process without giving them the veto.”
— Garrett Fulce
July 28, 2026
Energy costs and conflicts, with Kit Pfeiffer of the Energy Freedom Alliance of the Rockies
Kit Pfeiffer, President, Energy Freedom Alliance of the Rockies
The shale revolution, from Canada to the Eagle Ford in Texas, and how regulation shapes where U.S. oil and gas production goes next.
“The regulatory environment makes a huge difference on where we go from here as far as energy independence.”
— Kit Pfeiffer
April 21, 2026
Part 2: The economic impact of the Polar LNG project, with Joel Riddle
Joel Riddle, CEO, Polar LNG
Compares Alaska's North Slope opportunity to the Permian Basin boom in Midland, Texas, and describes plans for liquefaction trains built in Texas.
“That economic development is gonna be a huge opportunity to bolster not just the population, but the economic activity.”
— Joel Riddle
Related coverage
Frequently asked questions
How much does electricity cost in Texas?
The average retail price across all sectors was 9.97 cents per kilowatthour in 2025, compared with a U.S. average of 13.56 cents. Residential customers paid 15.40 cents on average, according to EIA's Electric Power Annual (Table 2.10).
Where does Texas get its electricity?
In 2025, natural gas produced 48.3% of Texas's utility-scale generation, wind 21.7%, coal 11.5%, utility-scale solar 11.0% and nuclear 7.0%, according to EIA's Electric Power Annual.
How fast is electricity demand growing in Texas?
Retail electricity sales rose about 25% from 2020 to 2025, according to EIA. ERCOT set an all-time peak of 91,155 MW on July 22, 2026 (unofficial until final settlement), and in June 2026 was tracking more than 438,000 MW of large-load connection requests, nearly 89% from data centers.
Is the Texas grid at risk this winter?
NERC's 2026–2027 Winter Reliability Assessment rates ERCOT at normal risk, an improvement from last winter, with an anticipated reserve margin of 34.8%. NERC still warns that extreme, wide-area cold could cause supply shortfalls, and its long-term assessment rates ERCOT at high risk in 2029–2030.
Has the Powering America Podcast covered Texas energy?
Yes. Garrett Fulce of Fulce Consulting discussed why Texas is betting big on data centers (June 9, 2026), and other episodes with Kit Pfeiffer and Joel Riddle touch on Texas oil and gas.
Sources
- EIA, Electric Power Annual 2025 (data for 2025, released Oct. 21, 2026)
- EIA, Table 2.10: Average price of electricity by end-use sector, by state, 2025 and 2024
- EIA, Table 2.8: Sales of electricity to ultimate customers by state, 2025 and 2024
- EIA, Table 3.7: Net generation by state by sector, 2025 and 2024
- EIA, Texas Electricity Profile 2024 (released Nov. 10, 2025)
- EIA, Texas Electricity Profile data tables (Tables 8 and 17)
- EIA, Today in Energy: Hourly peak load in ERCOT set a new record (Aug. 3, 2026)
- ERCOT, Yearly peak demand records (updated Nov. 6, 2026)
- ERCOT, PUCT approves ERCOT's Batch Zero process (June 18, 2026)
- ERCOT, Preliminary long-term load forecast for 2026–2032 (April 15, 2026)
- ERCOT, Market notice M-B051826-01: Proposal to adjust 2026 long-term load forecast (May 18, 2026)
- NERC, Winter Reliability Assessments (2026–2027 assessment, Nov. 18, 2026)
- NERC, Increasing demand and El Niño challenge winter grid reliability (Nov. 18, 2026)
- NERC, Summer Reliability Assessments (2026 assessment, May 2026)
- NERC, Long-Term Reliability Assessments (2025 assessment, January 2026)
- Texas Energy Fund, award tables (updated Nov. 2, 2026)
- OpenAI, OpenAI, Oracle and SoftBank expand Stargate with five new AI data center sites (Sept. 23, 2025)
Figures are compiled from the linked public sources as of Nov. 18, 2026. Reference only.